RFP, security questionnaire and DDQ glossary: 118 terms, A–Z
Short answer: This glossary defines 118 terms that come up when you respond to RFPs, RFIs, tenders, security questionnaires and due diligence questionnaires (DDQs), written from the responder's side. Each definition is one or two sentences. Where a term has a template or a full guide, the entry links to it.
Who this is for: proposal and bid teams, sales engineers, security and compliance teams, and anyone new to procurement language.
On this page
- What are the most important RFP terms to know?
- How are RFP, RFI and RFQ different?
- Glossary A–Z
- How Iris uses these terms
- FAQ
What are the most important RFP terms to know?
If you're new to responding, start with these ten:
| Term | One-line meaning |
|---|---|
| RFP | A buyer's formal request for proposals to solve a defined need |
| Go/no-go | The decision on whether to respond at all |
| Compliance matrix | A table mapping every requirement to your answer |
| Executive summary | The page that makes your case to evaluators |
| Evaluation criteria | How the buyer will score responses |
| SME | The subject-matter expert who owns an answer |
| Answer library | Your store of reusable, approved answers |
| Security questionnaire | A buyer's list of questions about your security controls |
| BAFO | The buyer's request for your final revised offer |
| Debrief | The buyer's explanation of why you won or lost |
How are RFP, RFI and RFQ different?
| RFI | RFP | RFQ | |
|---|---|---|---|
| Stands for | Request for information | Request for proposal | Request for quotation |
| Buyer's stage | Exploring options | Ready to choose a solution | Knows exactly what to buy |
| What you send | Information about capabilities | A full solution, approach and price | A price for a defined item or service |
| Usually decided on | Not decided; it informs a later RFP | Weighted criteria (value, fit, price) | Price, often lowest compliant |
Glossary A–Z
A
Addendum (RFP addendum)
A formal change or clarification the buyer issues after the RFP is released, often answering bidders' questions or moving deadlines. Responses typically must acknowledge every addendum by number; in US federal solicitations these are called amendments.
AICM / AI-CAIQ
The Cloud Security Alliance's AI Controls Matrix (AICM), a control framework for AI systems, and its companion self-assessment questionnaire, the AI-CAIQ. CSA released both in July 2025. Buyers use them to assess vendors that build or use AI.
Answer library
A curated store of reusable answers to frequently asked RFP and questionnaire questions, each with an owner and review date. Also called a content library or Q&A bank. In Iris: the Approved Answers Library.
Approval workflow
The defined sequence of reviews and sign-offs an answer or document goes through before submission. In Iris: multi-step approval workflows with review, approval and sign-off steps are in beta; per-question reviewers are available to all customers.
Approved answers
Answers that a subject-matter expert or content owner has reviewed and signed off for reuse. In Iris: approved answers feed the library through an inbox, so nothing becomes your source of truth without sign-off.
Award
The buyer's decision to give the contract to a bidder, usually followed by a notice to unsuccessful bidders.
B
BAFO (best and final offer)
The buyer's request, usually after negotiations, for bidders still in contention to submit a final revised proposal. In current US federal procurement it's called a final proposal revision. Full guide: BAFO.
Best value
An award approach where the buyer weighs price against non-price factors such as technical approach and past performance, rather than choosing on price alone. In US federal procurement it spans a range from lowest price technically acceptable to tradeoff (FAR 15.101).
Bid/no-bid
The decision on whether to respond to a specific RFP. Same as go/no-go in most teams. Scorecard template.
Bid manager
The person who runs a bid end to end: schedule, team, compliance and submission. Common title in the UK, Europe and construction; similar to a proposal manager.
Bid protest
A formal challenge by a bidder to the terms of a solicitation or to an award decision. In US federal procurement, protests can be filed with the agency, the Government Accountability Office (GAO) or the Court of Federal Claims.
Boilerplate
Standard text reused across responses, such as company history or standard security descriptions. Useful as a starting point; risky if not tailored or kept current.
C
CAIQ (Consensus Assessments Initiative Questionnaire)
A security questionnaire published by the Cloud Security Alliance (CSA), with questions mapped to the CSA Cloud Controls Matrix. Widely used to assess cloud and SaaS providers.
CAIQ Lite
A shorter subset of CAIQ questions for lighter-weight assessments. CSA still publishes it and updated it for CCM v4.1 in January 2026. Check which CAIQ version a customer means before answering.
Capability statement
A short (often one- or two-page) document summarizing a company's core competencies, differentiators, past performance and identifiers. Common in US government contracting.
Capture management
The work of positioning to win a specific opportunity before the RFP is released: understanding the customer, shaping requirements, choosing partners and building a win strategy.
Capture plan
The written plan for winning a specific opportunity: customer needs, competitors, win themes, teaming, pricing strategy and actions with owners.
CCM (Cloud Controls Matrix)
The Cloud Security Alliance's control framework for cloud computing, organized into domains. The CAIQ asks questions mapped to its controls.
Citation
A reference showing which source document supports a statement in an answer. In Iris: every drafted answer links to the sources it used.
Clarification questions
Questions bidders submit to the buyer, usually by a stated deadline, to resolve ambiguity in the RFP. Answers are typically shared with all bidders, often as an addendum.
CMMC (Cybersecurity Maturity Model Certification)
A US Department of Defense program that requires defense contractors to meet defined cybersecurity requirements for protecting federal contract information and controlled unclassified information.
Color team reviews (pink, red, gold)
A staged proposal-review practice. A pink team reviews the outline or storyboard early, a red team reviews a full draft as evaluators would, and a gold team gives final executive approval. Teams vary in the colors they use.
Competitive range
In US federal negotiated procurement, the group of most highly rated proposals the contracting officer keeps for discussions (FAR 15.306(c)).
Compliance matrix
A table listing every RFP requirement with your compliance status (comply, partial, exception) and where it's answered. Template.
Confidence label
An indicator of how well an AI-drafted answer is supported by the sources. In Iris: every draft is labeled High, Medium, Low or Contradictory, with a reason. Contradictory means your sources disagree.
Content expiration
A date after which a document or answer must be reviewed before reuse, so outdated facts don't reach buyers. In Iris: files and approved answers can carry expiration dates, and Iris reminds owners before content expires.
Content library
See answer library. Sometimes broader, including documents, case studies and images as well as Q&A.
Content owner
The person accountable for keeping a document or answer accurate and current. In Iris: files and approved answers each carry an owner.
Cover letter
A one-page letter that formally submits a proposal, confirms compliance and names a point of contact. Template.
Cover page
The title page of a proposal: buyer, RFP number and title, your company name, submission date and, sometimes, required identifiers.
CUEC (complementary user entity controls)
Controls that a SOC report assumes the customer (the user entity) operates. The report's conclusions depend on the customer doing their part.
D
DDQ (due diligence questionnaire)
A structured set of questions an investor, buyer or partner sends to assess an organization's operations, risk and controls. Common in asset management, private equity and vendor onboarding. Guide: DDQs
Debrief
A meeting or written explanation in which the buyer tells a bidder why it won or lost. US federal rules give offerors a right to request a debriefing in many negotiated procurements (FAR 15.505, 15.506).
Discriminator
A feature of your offer that sets you apart from competitors and that the buyer values. A strength every bidder shares isn't a discriminator.
DPA (data processing agreement)
A contract setting out how a vendor processes personal data on a customer's behalf, required in many cases under the EU GDPR (Article 28).
E
e-RFx
An RFx process run electronically through a sourcing platform or portal rather than by email or paper.
EOI (expression of interest)
A short submission in which suppliers signal interest and basic qualifications, used by buyers to build a shortlist before a full RFP or tender.
Evaluation criteria
The factors, and usually their weights, that the buyer will use to score responses. In US federal solicitations, they appear in Section M.
Exceptions and assumptions
The section where a bidder lists requirements or terms it won't meet as written (exceptions) and conditions its proposal depends on (assumptions). Both should be few and specific.
Executive summary
The one- to two-page section that tells evaluators what you'll deliver, what changes for them and why you're the lower-risk choice. Template and examples.
F
Features–benefits–proof
A writing pattern that states a feature, explains the benefit to this buyer, and gives evidence. It turns claims into scorable statements.
Final proposal revision
The US federal term for a BAFO: the last revision offerors in the competitive range may submit after discussions, with a common cut-off date (FAR 15.307(b)).
G
Ghosting
Highlighting the weaknesses of a competitor's likely approach without naming the competitor, for example by explaining why your approach avoids a known risk.
Go/no-go
A structured decision on whether to pursue an opportunity or respond to an RFP. Guide and scorecard. In Iris: the RFP Analyzer checks requirements against your content and recommends Go, Review or No-Go based on your criteria.
H
HECVAT (Higher Education Community Vendor Assessment Toolkit)
A security questionnaire maintained by EDUCAUSE that colleges and universities use to assess vendors' security and privacy practices.
HECVAT Lite
A shorter version of the HECVAT for lower-risk engagements. In HECVAT 4, EDUCAUSE rolled the Full, Lite and On-Prem versions into one file, so confirm which one an institution expects.
I
Incumbent
The supplier currently holding the contract being re-competed.
Intent to bid
A notice some buyers ask bidders to send by a set date, confirming they plan to respond. It helps the buyer plan and may be required to receive addenda.
ISO/IEC 27001
The international standard for an information security management system (ISMS). Organizations can be certified against it by an accredited certification body.
ITB / IFB (invitation to bid / invitation for bids)
A solicitation for sealed bids on a clearly specified requirement, usually awarded to the lowest responsive, responsible bidder. In US federal procurement, sealed bidding uses an IFB (FAR Part 14).
ITT (invitation to tender)
The common UK and European term for a formal request for bids or proposals, broadly equivalent to an RFP.
K
Knowledge base
The body of documents and answers a team draws on when responding: policies, product documentation, past responses and approved answers. In Iris: the Knowledge Map, which includes uploaded files, synced sources and the Approved Answers Library.
L
LPTA (lowest price technically acceptable)
A US federal source-selection approach in which the contract goes to the lowest-priced proposal that meets the minimum technical requirements, with no credit for exceeding them (FAR 15.101-2).
M
Management volume
The part of a proposal that describes how you'll run the work: organization, key personnel, project management, quality control and risk management.
MSA (master services agreement)
An umbrella contract setting general terms between two parties, under which individual statements of work or orders are issued.
MVSP (Minimum Viable Secure Product)
A short baseline security checklist for B2B software and services, developed by a group of technology companies, that some buyers use as a lightweight alternative to long questionnaires.
N
NIST CSF (Cybersecurity Framework)
A voluntary framework from the US National Institute of Standards and Technology for managing cybersecurity risk. Version 2.0 (2024) organizes outcomes under six functions: Govern, Identify, Protect, Detect, Respond and Recover.
NIST SP 800-171
A NIST publication setting security requirements for protecting controlled unclassified information (CUI) in non-federal systems. It underpins many US defense contractor requirements, including CMMC.
No-bid
A decision not to respond to an RFP. A short, courteous no-bid letter can keep you on the buyer's list for future opportunities.
"Not enough information" (abstention)
When an AI drafting tool declines to answer because the sources don't support an answer, instead of guessing. In Iris: the draft reads "There is not enough information to answer the question," is flagged, and can't be approved as-is.
O
Oral presentation (orals)
A live presentation or interview, often scored, in which shortlisted bidders present their proposal and answer the evaluators' questions.
P
Page limit
The maximum length the RFP allows for a response or a volume. Pages beyond the limit may not be read, or the response may be rejected.
Partial compliance
Meeting part of a requirement, or meeting it in a different way. State it plainly with the alternative; it's usually better received than an unsupported "comply".
Past performance
Evidence of how well you've delivered similar work, typically references or contract summaries. In US federal procurement it's often a formal evaluation factor.
PCI SAQ / AOC
Under the PCI Data Security Standard, a Self-Assessment Questionnaire (SAQ) lets eligible merchants and service providers assess their own compliance; the Attestation of Compliance (AOC) is the signed declaration of the result.
Pen test report
The report from a penetration test, in which testers attempt to exploit vulnerabilities. Vendors commonly share a summary or letter of attestation under NDA rather than the full report.
Pre-bid conference
A meeting the buyer holds after releasing the RFP to explain requirements and take questions. Attendance is sometimes mandatory to be eligible to bid.
Price volume (cost volume)
The part of a proposal containing pricing, often in a buyer-supplied format and submitted separately from the technical proposal.
Proposal management
The discipline of planning, writing, reviewing and submitting proposals on schedule and in compliance with the RFP.
Proposal manager
The person who leads a proposal: builds the schedule and outline, assigns writers and SMEs, enforces compliance and gets it submitted.
Proposal outline
The section-by-section structure of a response, ideally mirroring the RFP's instructions and evaluation criteria. RFP response template
Proposal schedule
The internal timeline for a response, with draft, review and sign-off dates set ahead of the buyer's deadline.
Pwin (probability of win)
An estimate, usually a percentage, of how likely you are to win an opportunity. Used to prioritize pursuits and investment.
Q
Qualification criteria
The conditions an opportunity must meet for you to pursue it, or that a bidder must meet to be considered, such as size, experience or certifications.
R
Rebid
A re-competition of an existing contract, usually when it expires. The current holder is the incumbent.
Request for tender (RFT)
A formal invitation to submit a tender (bid) for a contract. Common in the UK, Europe, Australia and the public sector; similar to an RFP.
Requirements traceability matrix
A table linking each requirement to where it's addressed and, often, how it'll be delivered and tested. Closely related to a compliance matrix.
Response format
The structure, file types, fonts, naming and submission method the RFP prescribes. Not following it can make a response non-compliant.
Response management
The ongoing practice and tooling for answering RFPs, RFIs, security questionnaires and DDQs: content, workflow, review and reuse across all of them.
Review cycle
A scheduled review of content, or a round of review on a response. In Iris: approved answers can carry review cadences that create review cycles assigned to reviewers.
RFI (request for information)
A buyer's request for general information about suppliers and their capabilities, used to explore the market before a formal RFP.
RFP (request for proposal)
A buyer's formal document asking suppliers to propose a solution, approach and price for a defined need, with instructions, requirements and evaluation criteria. How to write an RFP response
RFP coordinator
The person who manages the logistics of responses: intake, assignments, deadlines and assembly. Often an entry point into proposal management.
RFP in sales
How an RFP fits into a B2B sales cycle: usually a late-stage formal step, which is why teams that engage the buyer before the RFP tend to fare better.
RFP portal
A web platform where the buyer publishes the RFP and bidders submit responses, often by answering questions in form fields. In Iris: the Chrome extension can extract questions from a portal page and draft answers in the browser.
RFP shredding
Breaking an RFP down into every individual requirement, instruction and question, usually as the first step in building a compliance matrix. In Iris: question extraction pulls every question and requirement out of the document and keeps its numbering.
RFQ (request for quotation)
A request for prices on a clearly defined product or service, usually decided mainly on price.
RFQual / SOQ (request for qualifications / statement of qualifications)
A request for suppliers to submit their qualifications (experience, staff, references) so the buyer can shortlist before pricing is requested. The supplier's reply is a statement of qualifications.
RFx
Umbrella term for RFI, RFP, RFQ and similar requests.
S
Sales engineer (presales)
The technical member of a sales team who runs demos and answers technical questions, and often owns the technical and security sections of RFP responses.
Scope of work
The description of the work to be performed and its boundaries. Sometimes used interchangeably with statement of work, though a scope can be one section of a SOW.
Scoring matrix
The evaluator's tool for rating responses against each criterion, often with a defined scale and weights.
Section L / Section M
In US federal solicitations using the uniform contract format, Section L holds the instructions to offerors and Section M the evaluation factors for award (FAR 15.204-1). Compliance matrix guide
Security questionnaire
A list of questions a buyer sends to assess a vendor's security, privacy and compliance controls, either a standard (SIG, CAIQ, HECVAT) or the buyer's own. In Iris: questionnaires in Excel, Word, PDF or CSV, or in a web portal through the Chrome extension, are drafted from your own content with sources on every answer.
SIG (Standardized Information Gathering questionnaire)
A licensed third-party risk questionnaire published by Shared Assessments, covering a broad range of risk domains.
SIG Core
The comprehensive version of the SIG, used for higher-risk vendor relationships.
SIG Lite
A shorter version of the SIG for lower-risk relationships or initial screening.
SLA (service level agreement)
The contractual commitment to measurable service levels, such as availability or response times, and what happens if they're missed.
SME (subject-matter expert)
The person with the expertise to write or approve an answer in a specific area, such as security, legal or product. In Iris: questions can be assigned to SMEs or groups, who are notified and can comment and approve.
SOC 2 Type I / Type II
Attestation reports by an independent CPA firm on a service organization's controls relevant to the AICPA Trust Services Criteria (security, availability, processing integrity, confidentiality, privacy). Type I covers control design at a point in time; Type II covers design and operating effectiveness over a period.
SOC 2 bridge letter
A management-signed letter covering the gap between the end of the last SOC 2 report period and a later date. It isn't audited. Guide and template.
Sole source
A purchase from a single supplier without competition, which public buyers must usually justify.
Sources sought
A US government market-research notice asking capable businesses to identify themselves, often used to decide whether to set a contract aside for small businesses.
SOW (statement of work)
A document that defines the specific work, deliverables, timeline and acceptance criteria for a project, often under an MSA.
Storyboarding
Planning each proposal section's key messages, proof and graphics before writing, so reviewers can fix the argument before anyone drafts prose.
Subprocessor
A third party that a vendor engages to process customer data on its behalf. Vendors typically list them and notify customers of changes under the DPA.
T
Teaming agreement
An agreement between companies to pursue a contract together, typically one as prime contractor and others as subcontractors.
Technical volume
The part of a proposal describing your solution and technical approach to the requirements. Often the most heavily weighted volume.
TPRM (third-party risk management)
A buyer's program for assessing and monitoring the risks posed by vendors and partners. Security questionnaires are one of its main tools.
Trust center
A web page where a vendor publishes security and compliance information and lets customers request documents such as SOC 2 reports, often behind an NDA.
U
UEI (Unique Entity ID)
The 12-character identifier assigned through SAM.gov to entities doing business with the US federal government. It replaced the DUNS number in April 2022.
V
Vendor security assessment
A buyer's evaluation of a vendor's security posture, using questionnaires, evidence such as SOC 2 reports, and sometimes calls or audits.
Version control
Keeping track of changes to documents and answers so you know which version is current and can restore an earlier one. In Iris: approved answers keep version history with restore, and every edit and approval is logged with who and when.
VSAQ (Vendor Security Assessment Questionnaire)
A set of security questionnaires that Google released as open source for assessing vendors' security practices.
W
Weighted scoring
Scoring that multiplies each criterion's rating by its weight, so more important criteria count more. Used by buyers to evaluate responses and by bidders in go/no-go scorecards.
Win rate
The share of submitted bids you win. Calculate it consistently (by count or by value; including or excluding no-decisions) so it's comparable over time.
Win theme
A short, buyer-focused message, repeated through the proposal, that links a buyer need to your discriminator and its proof.
Win/loss analysis
Reviewing why bids were won or lost, from debriefs, buyer feedback and internal data, to improve future pursuits. In Iris: a win/loss dashboard, synced from Salesforce or HubSpot or set manually, is in beta.
How Iris uses these terms
Iris is AI software for RFP, security questionnaire and DDQ responses. A few of the terms above describe how it works:
- RFP shredding and RFP portals: upload an RFP or questionnaire (Excel, Word, PDF or CSV), or use the Chrome extension on a web portal, and Iris extracts every question.
- Go/no-go: the RFP Analyzer checks each requirement against your content (met, partial or likely not met, with sources) and recommends Go, Review or No-Go on your own criteria.
- Citations and confidence labels: every drafted answer links to its sources and carries a High, Medium, Low or Contradictory label.
- Abstention: when your content doesn't cover a question, Iris says "There is not enough information to answer the question" instead of guessing.
- Approved answers and version control: nothing becomes your source of truth without sign-off, and every edit and approval is logged with who and when.
Iris is rated 4.8/5 on G2 from 92 reviews (November 2026). Try Iris free on an RFP you've already answered.
FAQ
What does RFx mean?
RFx is shorthand for the family of procurement requests: RFI (information), RFP (proposal), RFQ (quotation) and similar documents such as RFT (tender).
What's the difference between a bid and a proposal?
In everyday use they're interchangeable. Strictly, a bid often means a price offer against a fixed specification (as in sealed bidding), while a proposal describes a solution and approach as well as price.
What's the difference between a security questionnaire and a DDQ?
A security questionnaire focuses on information security and privacy controls. A DDQ is broader due diligence, covering operations, governance, finance and compliance as well as security, and is common in investment and partner onboarding.
What's the difference between SOC 2 Type I and Type II?
Type I reports on whether controls are suitably designed at a single point in time. Type II also tests whether they operated effectively over a period, usually several months to a year.
Is BAFO the same as a final proposal revision?
In US federal procurement, yes: "final proposal revision" is the current FAR term. See the BAFO guide.
What is a compliance matrix used for?
To list every requirement in an RFP with your compliance status and where it's answered, so nothing is missed. See the compliance matrix template.
See it live
Respond to RFPs
without the grind.
Book a demo and see your real auto-fill rate on a translation
RFP from your pipeline.