RFP and proposal checklist (pre-submission)

RFP Tips

Author:

Chris Mabry

Short answer: A pre-submission proposal checklist is the final set of checks you run before submitting an RFP response. It confirms the response is compliant (every instruction followed, every requirement answered, every form signed), accurate (facts, names and numbers checked), consistent (price matches scope; cover letter matches the compliance matrix) and delivered correctly (right format, right portal, before the deadline). Run it at least one business day before the due date, and give each item an owner.

In Iris: before export, "Notify Unapproved" nudges everyone who still has open, unapproved answers, in one click.

Who this is for: proposal coordinators and managers doing the final check on an RFP, RFQ, tender or security questionnaire response.

On this page

  1. When should you run the checklist?
  2. The 45-item pre-submission checklist
  3. Which mistakes are fatal?
  4. How do you run the final check as a team?
  5. FAQ

When should you run the checklist?

CheckpointWhenWhich sections
KickoffDay 1–3A (compliance setup)
After draftingBefore red-team reviewB (content)
Final checkInternal deadline, ≥ 1 business day before dueAll, especially C–F
Post-uploadImmediately after submittingF (confirmation)

The 45-item pre-submission checklist

★ = fatal if missed in most formal RFPs (can make the bid non-responsive). Download the checklist (XLSX) · Download the printable checklist (PDF)

A. Compliance with instructions

#CheckOwner★
1Every addendum and amendment received, read and acknowledged as requiredProposal manager★
2Response follows the prescribed outline and numberingProposal manager
3Every requirement in the compliance matrix has a response locationProposal manager★
4Page limits met per volume or sectionCoordinator★
5Font, margin and file-format rules followedCoordinator
6Mandatory minimum qualifications met and evidencedProposal manager★
7Answers to the buyer's Q&A reflected in the responseProposal manager
8Price kept out of non-price volumes if requiredCoordinator★

B. Content quality

#CheckOwner★
9Every question answered; no blanks, "TBD" or placeholdersWriters★
10Each answer responds to the question asked, not a nearby oneReviewers
11Yes/No questions answered Yes or No first, then explainedReviewers
12Partial compliance stated honestly with the gap and plan (examples)SMEs
13Win themes appear in the executive summary and key sections (guide)Proposal manager
14Claims are backed by proof (reference, metric, certificate)Reviewers
15Technical answers checked by the SME who owns themSMEs
16Security answers match current policies and evidenceSecurity lead
17No other customer's name anywhere (search the files)Coordinator
18Buyer's name, RFP number and title correct throughoutCoordinator
19Terminology consistent (product names, buyer's terms)Editor
20Commitments (dates, SLAs, deliverables) are ones you can keepSales lead
21Executive summary written last and matches the final responseProposal manager

C. Pricing and commercial

#CheckOwner★
22Buyer's price form used without structural changesFinance★
23Every price cell completed; totals recalculate correctlyFinance★
24Price matches the scope, staffing and schedule in the technical volumeFinance + PM
25Assumptions and exclusions statedFinance
26Price validity period meets the RFP's minimumFinance★
27Contract exceptions listed where the RFP requires, approved by legalLegal★

D. Forms, signatures and attachments

#CheckOwner★
28All required forms completed (certifications, representations, questionnaires)Coordinator★
29Signatures from an authorized signer, datedExecutive★
30Notarization, if requiredCoordinator★
31Insurance certificates, licences, registrations attached as requiredCoordinator
32Résumés for named key personnel attached and matched to requirementsPM
33References with current contact details (with permission)Sales lead
34Security evidence (SOC 2 report or bridge letter, pen test summary) attached if requested (evidence checklist)Security lead

E. Formatting and production

#CheckOwner★
35Cover page and cover letter complete and correctCoordinator
36Table of contents updated; page numbers correctCoordinator
37Headers and footers show the RFP number and your company nameCoordinator
38Cross-references point to the right sectionsEditor
39Tracked changes accepted and comments removedCoordinator★
40File metadata (author, previous customer names) cleanedCoordinator
41Files named as instructed and under any size limitCoordinator★
42Proprietary-information markings applied as the RFP specifiesLegal

F. Submission

#CheckOwner★
43Portal account working; upload tested before the deadline dayCoordinator★
44Submitted before the deadline (check time zone), or hard copies delivered with the right number of copiesProposal manager★
45Confirmation received and saved; submitted files archivedCoordinator

Which mistakes are fatal?

The ★ items are the ones that commonly make a response non-responsive: missing an addendum acknowledgement, a missing signature or form, an altered price form, blank required fields, page-limit overruns, a late submission. Content quality decides whether you win; compliance decides whether you're evaluated at all.

FailureTypical consequence
Late submissionUsually rejected without evaluation
Missing mandatory form or signatureOften non-responsive
Addendum not acknowledgedCan be non-responsive
Over page limitExcess pages may not be read
Content error (wrong customer name)Not disqualifying, but costly to credibility

How do you run the final check as a team?

  1. Split the list by owner and send each person their rows with a deadline.
  2. Run sections C–F with fresh eyes. The person who built the document shouldn't be the only one checking it.
  3. Search, don't read, for names: search the files for every recent customer's name and the previous buyer's RFP number.
  4. Recalculate price from scratch, not by checking totals visually.
  5. Upload early. Many portals allow replacing a submission until the deadline.
  6. After submission, add any new, approved answers to your answer library.

How Iris helps

Iris is AI software for RFPs, security questionnaires and proposals.

  • See what's still open. Per-question reviewers, approval history and bulk approve, and "Notify Unapproved" to nudge everyone with open work in one click. Route answers through review before export.
  • No silent blanks. When your content doesn't support an answer, Iris says "There is not enough information to answer the question," flags it as Missing Info, and won't let it be approved as-is.
  • Old customer names removed. Iris strips other customers' names out of reused past answers.
  • Back into the original file. Export into the original Excel workbook, a branded Word template, CSV, or onto the source PDF, with cited files and attachments if you choose.

Iris is rated 4.8/5 on G2 from 92 reviews (November 2026). Try Iris free on an RFP you've already answered.

FAQ

What is a proposal checklist?
A list of checks run before submitting a proposal to confirm it's compliant, accurate, consistent and delivered correctly.

What should an RFP checklist include?
Compliance with instructions, content quality, pricing, forms and signatures, formatting, and submission. The 45 items above cover all six.

When should I start the checklist?
Set up the compliance items at kickoff and run the full list at your internal deadline, at least one business day before the due date.

Who should own the checklist?
The proposal manager owns it; individual items belong to the people best placed to check them.

Is this the same as a checklist for writing an RFP?
No. This checklist is for vendors submitting a response. Buyers writing an RFP need a different list.

See it live

Respond to RFPs
without the grind.

Book a demo and see your real auto-fill rate on a translation
RFP from your pipeline.