Request for qualifications (RFQ/SOQ): how to write a statement of qualifications
Short answer: A request for qualifications (RFQ, sometimes RFSQ) asks firms to submit a statement of qualifications (SOQ) so the buyer can rank or short-list them on experience, team and approach, usually before price is discussed. It's common for architecture, engineering, construction management, design-build and professional services. For US federal architect-engineer work, the Brooks Act requires selection on demonstrated competence and qualifications, with price negotiated afterward with the top-ranked firm, typically using the SF 330 form. Write your SOQ to the stated evaluation criteria, in their order, with relevant projects and the actual people who will do the work.
Who this is for: business development and proposal teams at A/E, construction, consulting and professional-services firms responding to public-sector or institutional RFQs.
On this page
- What does "request for qualifications" mean?
- How does qualifications-based selection work?
- What goes in a statement of qualifications?
- How is an SOQ scored?
- Example SOQ excerpt, annotated (fictional firm)
- Common mistakes
- How Iris helps
- FAQ
What does "request for qualifications" mean?
RFQ means two different things. Check which one you've received:
| Request for qualifications | Request for quotation | |
|---|---|---|
| Asks for | Your experience, team, approach | A price for defined goods or services |
| Price included? | Usually no (price comes later) | Yes, it's the point |
| Typical use | A/E, construction, design-build short-lists, consultant pools | Commodities, simple services, federal simplified acquisitions |
| What you submit | Statement of qualifications (SOQ), SF 330 for federal A/E | A quote |
An RFQ (qualifications) can be the whole selection, or the first stage of a two-step process where short-listed firms then receive an RFP.
How does qualifications-based selection work?
| Step | Federal A/E (Brooks Act) | Typical state/local |
|---|---|---|
| 1. Public notice | Agency publicly announces the requirement (FAR 36.601-1) | Posted on the agency's portal or newspaper |
| 2. Submissions | SF 330 (Part I project-specific, Part II general firm qualifications) | SOQ in the format the RFQ specifies; some states use the SF 330 or their own form |
| 3. Evaluation | A board evaluates firms on criteria such as specialized experience, capacity, past performance and knowledge of the locality | Evaluation committee scores against published criteria |
| 4. Short-list and interviews | Discussions with the most highly qualified firms | Interviews or presentations are common |
| 5. Ranking | Firms ranked on qualifications | Firms ranked |
| 6. Price | Negotiate a fair and reasonable price with the top-ranked firm; if that fails, move to the next | Same principle in states with "mini-Brooks" laws; varies by state |
The governing federal statute is 40 U.S.C. 1101 et seq. (the Brooks Act), cited in FAR 36.601-1, which says agencies negotiate A/E contracts "based on the demonstrated competence and qualifications of prospective contractors." Many states have their own qualifications-based selection laws for A/E services, so check the RFQ and your state's procurement code for the statute that applies.
What goes in a statement of qualifications?
Follow the RFQ's outline exactly. Where it's silent, this order works:
| Section | What to include | Tip |
|---|---|---|
| Cover letter | RFQ number, firm, contact, a two-sentence summary of why you fit | One page; see our cover letter template |
| Firm overview | Size, offices, disciplines, relevant licenses and registrations | Facts only |
| Project understanding | Your read of the project's goals, constraints and risks | Show you studied their site, program or problem |
| Key personnel | Named project manager and leads, roles, resumes with relevant projects | Commit the people you'll actually staff |
| Relevant experience | 3 to 10 similar projects (as the RFQ asks): owner, scope, size, dates, your role, outcome, reference | Same project type and scale beat prestige |
| Approach and methodology | How you'd deliver: phases, QA, schedule control, stakeholder engagement | Specific to this project |
| Capacity and availability | Current workload, ability to start | Back it up with staffing numbers |
| Required forms | Licenses, insurance, certifications, SF 330 if federal | Signed and complete |
How is an SOQ scored?
Weights vary by RFQ. A typical published scheme looks like this (illustrative, not from any specific RFQ):
| Criterion | Example weight | What earns top marks |
|---|---|---|
| Relevant project experience | 30% | Several completed projects of the same type, size and delivery method |
| Key personnel qualifications | 25% | Named staff who did those projects, with licenses |
| Project understanding and approach | 20% | Project-specific risks identified, with a credible plan |
| Capacity / availability | 10% | Staff available, clear workload plan |
| Local knowledge / past performance with owner | 10% | Familiarity with the site, codes or the owner's standards |
| Small/disadvantaged business participation | 5% | Meaningful roles, not token percentages |
Map each criterion to a section heading so evaluators find what they're scoring.
Example SOQ excerpt, annotated (fictional firm)
A fictional county RFQ for design of a 40,000 sq ft public library. A fictional firm, "Aldergrove Architects," writes under "Relevant Experience":
Project 1: [City] Branch Library, 36,000 sq ft, new construction (completed [year]) (①)
Owner: City of [x] Public Works. Delivery: design-bid-build. Construction cost: $[x]M. Role: architect of record.
Same building type, comparable size and delivery method as the County's project. Included a children's wing, community meeting rooms and a 180-kW rooftop solar array, the three program elements in RFQ §2.3. (②)
Outcome: bid within [x]% of the construction estimate; LEED [level] certified. (③)
Proposed team member on this project: [Name], AIA, Project Architect, proposed here as Project Manager. (④)
Reference: [Name, title, phone, email].
Annotations: ① heading states type, size, scope and date at a glance; ② relevance written against the County's own program list; ③ outcomes an owner cares about: cost accuracy and certification; ④ ties the project to a named proposed team member, which evaluators look for under key personnel.
Common mistakes
- Generic project sheets reused without a relevance line.
- Proposing people who won't staff the project ("bait and switch" is noticed at interview).
- Including price when the RFQ says not to. In federal A/E selections price isn't a selection criterion at this stage.
- Missing a required form or exceeding page limits.
- An approach section that could apply to any project.
How Iris helps
- Reusable qualifications: keep approved project descriptions, firm facts and boilerplate in the Approved Answers Library with owners and expiry dates, so references and figures are reviewed before reuse.
- Drafts against the RFQ's questions from your own content, with citations, and "There is not enough information to answer the question" where you don't have a matching project rather than an invented one.
- RFP Analyzer pulls out evaluation criteria, submission requirements, dates and contacts from the RFQ document, cited to the page.
- Personnel library (limited beta): staff profiles with expertise, certifications and projects that answers can draw on.
Iris is rated 4.8/5 on G2 from 92 reviews (November 2026). Try Iris free on an RFP you've already answered, or on a past SOQ.
FAQ
What's the difference between an RFQ and an RFP?
An RFQ (qualifications) ranks firms on qualifications; an RFP asks for a full proposal, usually including price. Some buyers use an RFQ to short-list, then issue an RFP.
What is an SOQ?
A statement of qualifications: the document you submit in response to a request for qualifications.
What is the SF 330?
The federal Architect-Engineer Qualifications form, used for A/E selections. Part I is project-specific; Part II is general firm information. Check GSA's forms library for the current edition.
Do I include fees in an SOQ?
Only if the RFQ asks. Under qualifications-based selection, fees are negotiated with the top-ranked firm.